Skip to content

JOB-26-0422

CostingOn track

Bilge pump bracket, rev A, for Buyer BUY-004.

Buyer
Buyer BUY-004
Halifax, NS
Quote
CF-Q-26-0950
In review at the desk
Order
Not yet
When the buyer accepts
Quote by
5 Nov 2026, 12:30
Owner
Alex (demo)
Estimator

Machining for this job

Shops quote the machining alone: the metal arrives cut to size with its mill certificate, and we book every freight leg.
Part
Bilge pump bracket
HM-118 rev A
Quantity
24
3 operations
Shop finishes by
No date yet
Machining on the cost sheet
$0.00

Machining requests

Each request asks for the machining only. Bids side by side, cheapest first, against the rules check price for the same work.

MR-26-0437: Bilge pump bracket

24 pieces, sent 5 Nov 2026 to 2 shops, bids due 5 Nov 2026, 14:00

Waiting for bidsView request
  1. 10Profile from plate
  2. 20Drill and slot
  3. 30Deburr and inspect

No bids yet.

Shop NS-014 hasn’t opened the request yet.

Shop NS-021 opened the request 5 Nov 2026, 09:10 and hasn’t bid.

Work orders

An award makes a work order in the shop’s portal and a purchase order on our paper.

No work order yet. Awarding a bid makes one.

Write a machining request

Shops quote the machining only. Each gets the drawing, the operations, the quantity and the metal it’ll receive cut to size with its mill certificate.

Metal supplied
316
Plate 0.500 × 3.375 in, cut to 6.125 in
Pieces
24
Cut to size, spares included
Certificate
EN 10204 3.1
Heat known when it ships
Arrives at the shop
18 Nov 2026

The shop machines the Bilge pump bracket from this metal and checks the count, the heat and the size against the mill certificate when it arrives.

Operations

All of them, unless the job is split across shops.

  • ISO 2768-m, 3-axis
  • 2 × 8.5 × 20, 3-axis
  • 1 in 5, inspection

Finished parts

Shops

Active, verified shops with the process and the material, best on-time record first.

  • Lévis, QC, 3-axis milling, 5-axis milling, grinding
    60% booked95% on timeControlled Goods registered
Controlled drawings go only to shops registered in the Controlled Goods Program, through the controlled lane. The lane isn’t deployed yet, so a controlled request stops here.

Shops usually bid within a working day.

Ready for our carrier to pick up.

What the drawing doesn’t say.

Bids come back to this job and the inbox.