Skip to content
CanadaFab

Signed in as

Morgan (demo)

CanadaFab quote desk


Account settingsSign out

Margins

Costing study defaults

The parameters every quote’s four lines read. Version demo-2026-10-01, in force since 1 Oct 2026.

Metal markup
20%
Our markup on the metal we buy
Machining gross margin
28%
On the shop’s machining-only price
Freight markup
10%
Handling on rated freight
Blended margin, demo order
22.29%
On CF-Q-26-0921, before tax

Parameters

Each value, with what it does to the site’s demo order, CF-Q-26-0921.

Parameters
ParameterValueOn CF-Q-26-0921

Metal markup

Added to the metal’s cost: stock, saw cuts and the mill certificate.

20%Cost $995.16, line $1,194.19

Machining gross margin

The share of the machining line we keep; the shop’s bid is the rest.

28%Cost $1,150.00, line $1,597.22

Finishing markup

Added to an outside finisher’s price.

15%No outside finishing on this order

Freight markup

Added to every rated leg: supplier to shop, shop to shop, shop to buyer.

10%Cost $165.00, line $181.50

Expedite factor

Multiplies the machining line when the buyer picks the expedited lead time.

× 1.25Standard lead time on this order, × 1.00

Minimum line

The least a part’s metal, machining and finishing can come to.

$150.00Not applied: the part came to $2,791.41

Subtotal $2,972.91, our margin $662.75, total with tax $3,359.39. Open its cost sheet

Stock sizing

How blanks are sized before the price table is read.

Allowance a side, milled
1.5 mm
Radial allowance, turned
1 mm
Face allowance, turned
1 mm
Chuck grip, turned
0 mm
Vise hold, milled
0 mm
Saw increment
0.125 in
Spare blanks
1 up to 10 pieces, then 2% rounded down
Densities
10 grades, from handbook values

Change log

Every version with its reason. Past versions are never edited.

  1. demo-2026-10-01

    Costing study defaults

    From 1 Oct 2026. Not approved yet.

    The costing study’s defaults (25 Sep 2026): metal 20%, machining gross margin 28%, finishing 15%, freight 10%, expedite 1.25, minimum line $150, with an economy factor of 0.95 added as a demo value. Small orders blend near 22%. Waiting on approval.

In the audit log

  • 1 Oct 2026, 08:00, Morgan (demo): Margin parameters set to the costing study’s defaults, pending approval

How changes work

  • A change is a new version with a reason and a start date.
  • A quote keeps the version it was priced with, even after a change.
  • The desk can override a line on one job with a reason code; the override goes in the audit log.

Approve demo-2026-10-01

Quotes priced after approval carry the approved version. Quotes already sent keep the version they were priced with.

The approval goes in the audit log with your name.

Propose a change

A change is a new version with a reason and a start date. It waits for approval.

After today.

Why, with the evidence: a study, a month’s jobs, a supplier’s terms.