Skip to content
CanadaFab

Signed in as

Alex (demo)

CanadaFab quote desk


Account settingsSign out

Machining request MR-26-0396

Awarded

Sensor cover rev A, 60 pieces, operations 10 to 30. Bids due 22 Sep 2026, 16:00.

Awarded to Shop NS-014

Work order WO-26-0398 and purchase order SPO-26-0396 went to the shop.
Job
JOB-26-0395
Order CF-26-10322
Quantity
60 pieces
3 operations, machining only
Due at the shop’s dock
8 Oct 2026
Metal arrives 28 Sep
Bids due
22 Sep 2026
16:00
Sent
21 Sep 2026
By Alex (demo)

Bids compared

Machining only, cheapest first, against the rules check price for the same work.

Bids on MR-26-0396
ShopMachiningDaysAgainst checkCapacityRecordAction
Shop NS-014Dartmouth, NSAwarded$980.00$128.00 setup, $14.20 a piece8 daysReady 7 Oct56%68% booked120 h a week96% on timeControlled Goods registeredWO-26-0398
Shop NS-021Truro, NSNot selected$1,050.00$150.00 setup, $15.00 a piece10 daysReady 9 Oct, after the due date60%45% booked80 h a week92% on timeNot registered for Controlled Goods

Rules check price for the same work: $1,742.10.

The request as sent

What each shop got: the operations, the drawing and model, and the email.

Operations

Operations
OpOperationSpecificationMachine
10Mill cover and pocketISO 2768-m3-axis
20Drill 4 × Ø3.4Per drawing3-axis
30DeburrBefore anodizeBench

Drawing and model

The shops download them from the request in their portal.

  • sensor-cover-rev-a.step

    245 KB, STEP model, rev A

  • DB-0875-A.pdf

    134 KB, drawing, rev A

Email to the shops

Sent 21 Sep 2026, 12:00 to 2 shops

Machining-only request MR-26-0396: Sensor cover, 60 pieces

Your price for operations 10, 20, 30 only. Metal arrives cut to size with its mill certificate on 28 Sep 2026. Parts due at your dock on 8 Oct 2026. Reply by 22 Sep 2026.

Machining only. Metal arrives cut to size with its mill certificate; we book every freight leg.