Skip to content
CanadaFab

Signed in as

Alex (demo)

CanadaFab quote desk


Account settingsSign out

Machining request MR-26-0421

Awarded

Pump manifold rev B, 30 pieces, operations 10 to 40. Bids due 15 Oct 2026, 15:00.

Awarded to Shop QC-018

Work order WO-26-1507 and purchase order SPO-26-0421 went to the shop.
Job
JOB-26-0411
Order CF-26-10376
Quantity
30 pieces
4 operations, machining only
Due at the shop’s dock
10 Nov 2026
Metal arrives 27 Oct
Bids due
15 Oct 2026
15:00
Sent
15 Oct 2026
By Alex (demo)

Bids compared

Machining only, cheapest first, against the rules check price for the same work.

Bids on MR-26-0421
ShopMachiningDaysAgainst checkCapacityRecordAction
Shop QC-018Lévis, QCAwarded$1,400.00$245.00 setup, $38.50 a piece9 daysReady 31 Oct68%60% booked110 h a week95% on timeControlled Goods registeredWO-26-1507
Shop NS-014Dartmouth, NSNot selected$1,465.00$268.00 setup, $39.90 a piece8 daysReady 30 Oct72%68% booked120 h a week96% on timeControlled Goods registered
Shop QC-011Saint-Laurent, QCNot selected$1,505.00$275.00 setup, $41.00 a piece10 daysReady 1 Nov73%71% booked150 h a week97% on timeControlled Goods registration in progress

Rules check price for the same work: $2,047.90.

The request as sent

What each shop got: the operations, the drawing and model, and the email.

Operations

Operations
OpOperationSpecificationMachine
10Square the blockISO 2768-m3-axis
20Mill ports and faces, 4 setupsISO 2768-m3-axis
30Cross-drill passagesØ6, 70 deep3-axis
40Tap 6 × M14 × 1.5, deburr, inspectBurr check at every junctionInspection

Drawing and model

The shops download them from the request in their portal.

  • collecteur-pompe-rev-b.step

    1.2 MB, STEP model, rev B

  • MD-0411-B.pdf

    402 KB, drawing, rev B

Email to the shops

Sent 15 Oct 2026, 11:00 to 3 shops

Machining-only request MR-26-0421: Pump manifold, 30 pieces

Your price for operations 10, 20, 30, 40 only. Metal arrives cut to size with its mill certificate on 27 Oct 2026. Parts due at your dock on 10 Nov 2026. Reply by 15 Oct 2026.

Machining only. Metal arrives cut to size with its mill certificate; we book every freight leg.