Shop QC-011
Partner shopVerifiedSaint-Laurent, QC. Joined 28 Sep 2026. Works in French.
Verification
Checked against the originals. Every check is dated and in the audit log.
Controlled Goods registration
In progressNot checked yet
ISO 9001 certificate
CertifiedDEMO-ISO-QC011, Registrar A (demo)
Expires 30 Nov 2027. Checked 2 Oct 2026
Liability insurance
On fileInsurer A (demo), Liability $5,000,000
Expires 30 Apr 2027. Checked 2 Oct 2026
Banking for payouts
VerifiedBusiness account ending 6125
Checked 2 Oct 2026
Not registered in the Controlled Goods Program
Documents
The files behind each check. Ask for an update when one is due.
ISO 9001 certificate
DEMO-ISO-QC011, Registrar A (demo). Expires 30 Nov 2027. Checked 2 Oct 2026
On fileCertificate of insurance
Insurer A (demo), Liability $5,000,000. Expires 30 Apr 2027. Checked 2 Oct 2026
On fileVoid cheque or bank letter
Business account ending 6125. Checked 2 Oct 2026
On filePartner shop agreement
Accepted 28 Sep 2026, when the account opened
On file
Files are kept in Montreal with the organization’s record. The demo keeps none.
People
1 person with an account.
| Person | Role | Two-step | Last sign-in |
|---|---|---|---|
Karim (demo) karim@qc-011.example | Shop admin | Off | 5 Nov |
Staff notes
Kept with the record and never edited. Only staff see them.
No notes yet.
- ID
- QC-011
- Type
- Partner shop
- Location
- Saint-Laurent, QC
- Joined
- 28 Sep 2026
- Language
- French
- Main contact
- Karim (demo)karim@qc-011.example
- Address
- 2100, boulevard Démo, Saint-Laurent QC H4S 0A0
- Processes
- Turning, Mill-turn, Swiss-type turning, 3-axis milling
- Machines
- CNC lathe × 3, Lathe with live tooling × 2, Swiss-type lathe × 1, Vertical machining centre, 3-axis × 1, Coordinate measuring machine × 1
- Materials
- Aluminum, Carbon steel, Alloy steel, Stainless steel, Brass and copper
- Capacity
- 150 h a week, 71% booked
- Record
- 97% on time, 99% quality, 33 jobs
- Payouts
- EFT, 15 days
Activity
- Downloaded the drawing for MR-26-0433
5 Nov 2026, 08:30, Karim (demo)
- Signed in with an email link
5 Nov 2026, 08:30, Karim (demo)
- Downloaded the drawing for MR-26-0431
26 Oct 2026, 11:30, Karim (demo)
- Downloaded the drawing for MR-26-0435
21 Oct 2026, 14:05, Karim (demo)
- Downloaded the drawing for MR-26-0421
15 Oct 2026, 14:10, Karim (demo)
- Downloaded the drawing for MR-26-0423
13 Oct 2026, 13:50, Karim (demo)