Skip to content
CanadaFab

Signed in as

Morgan (demo)

CanadaFab quote desk


Account settingsSign out

Shop QC-018

Partner shopVerified

Lévis, QC. Joined 6 Oct 2026. Works in French.

Verification

Checked against the originals. Every check is dated and in the audit log.

  • Controlled Goods registration

    Registered

    DEMO-CGP-QC018

    Expires 29 Feb 2028. Checked 2 Oct 2026

  • ISO 9001 certificate

    Certified

    DEMO-ISO-QC018, Registrar A (demo)

    Expires 30 Nov 2027. Checked 2 Oct 2026

  • Liability insurance

    On file

    Insurer A (demo), Liability $5,000,000

    Expires 30 Apr 2027. Checked 2 Oct 2026

  • Banking for payouts

    Verified

    Business account ending 2294

    Checked 2 Oct 2026

Registered, and still not eligible for controlled work

The controlled lane isn’t deployed, so no controlled drawing goes to any shop yet. The lane’s status

Documents

The files behind each check. Ask for an update when one is due.

  • Controlled Goods registration letter

    DEMO-CGP-QC018. Expires 29 Feb 2028. Checked 2 Oct 2026

    On file
  • ISO 9001 certificate

    DEMO-ISO-QC018, Registrar A (demo). Expires 30 Nov 2027. Checked 2 Oct 2026

    On file
  • Certificate of insurance

    Insurer A (demo), Liability $5,000,000. Expires 30 Apr 2027. Checked 2 Oct 2026

    On file
  • Void cheque or bank letter

    Business account ending 2294. Checked 2 Oct 2026

    On file
  • Partner shop agreement

    Accepted 6 Oct 2026, when the account opened

    On file

Files are kept in Montreal with the organization’s record. The demo keeps none.

People

1 person with an account.

People
PersonRoleTwo-stepLast sign-in
Sophie (demo)

sophie@qc-018.example

Shop adminOff3 Nov

Staff notes

Kept with the record and never edited. Only staff see them.

No notes yet.

Profile
ID
QC-018
Type
Partner shop
Location
Lévis, QC
Joined
6 Oct 2026
Language
French
Main contact
Sophie (demo)sophie@qc-018.example
Address
15, rue de l’Exemple, Lévis QC G6V 0A0
Capabilities
Processes
3-axis milling, 5-axis milling, Grinding
Machines
Vertical machining centre, 3-axis × 2, 5-axis machining centre × 1, Surface grinder × 1, Coordinate measuring machine × 1
Materials
Aluminum, Alloy steel, Stainless steel
Capacity
110 h a week, 60% booked
Record
95% on time, 99% quality, 14 jobs
Payouts
EFT, 15 days

Activity

  1. Downloaded the drawing for MR-26-0421

    15 Oct 2026, 13:00, Sophie (demo)

  2. Downloaded the drawing for MR-26-0426

    15 Oct 2026, 12:45, Sophie (demo)

Suspend Shop QC-018

No new requests or awards go to it while it’s suspended. Its people keep read access to their own records.

What happened and what would lift it. Kept with the record.

Record a check: Controlled Goods registration

What you saw for Shop QC-018, against the original.

Result

As printed on the certificate.

Who you spoke to, or what you compared.

Record a check: ISO 9001 certificate

What you saw for Shop QC-018, against the original.

Result

As printed on the certificate.

Who you spoke to, or what you compared.

Record a check: Liability insurance

What you saw for Shop QC-018, against the original.

Result

As printed on the certificate.

Who you spoke to, or what you compared.

Record a check: Banking for payouts

What you saw for Shop QC-018, against the original.

Result

Who you spoke to, or what you compared.