JOB-26-0401
CompleteMetMounting rail, rev A, for Demo buyer company, at Shop NS-014.
- Buyer
- Demo buyer company
- Kanata, ON
- Ships by
- 16 Oct 2026
- Delivery by 20 Oct 2026
- Owner
- Alex (demo)
- Estimator
Cost sheet
Study defaults, not approved yet- Quote, before tax
- $1,797.00
- What the buyer sees
- Our cost
- $1,387.17
- Supplier, shop and carriers
- Gross margin
- 22.8%
- $409.83
- Bids against check price
- 42.2%
- 100% means the bid matches the rules
Metal: Mounting rail
6061-T6, 40 pieces, Milled. Priced from the dated table, cheapest supplier first.
Stock from the geometry
- Part envelope
- 240 × 30 × 20 mm
- Milled
- Allowance
- 1.5 mm a side
- Needed
- 243 × 33 × 23 mm
- Stock size
- Bar, 1.500 × 1.000 × 9.625 in
- 38.1 × 25.4 × 244.48 mm
- Blanks
- 40, no spares
- Weight
- 25.6 kg
- 0.6 kg a blank
Lengths round up to the saw increment, 0.125 in, on the supplier’s size list.
Price from the table
Canadian metal supplier, QC. Price list valid 1 Jul 2026 to 30 Sep 2026.
| Supplier | Price | Cost | Line |
|---|---|---|---|
| Canadian metal supplier, QCCheapest, on the quote | $13.90 a kg | $475.17 | $570.20 |
| Canadian metal supplier, ON | $6.50 a lb ($14.33 a kg) | $516.15 | $619.38 |
| Canadian metal supplier, NS | $16.50 a kg | $536.60 | $643.92 |
Machining
Machining-only bids from shops, with the metal supplied cut to size. The line adds a 28% gross margin.
- Bid, machining only
- $774.00
- Rules check price
- $1,833.53
- Bid against check
- 42.2%
- Machining line
- $1,075.00
Line = bid ÷ (1 − 28%) × lead factor 1.00.
MR-26-0402Operations 10 to 30, 40 pieces
| Shop | Price | Days | Ships | Against check | Status |
|---|---|---|---|---|---|
| Shop NS-014Dartmouth, NS | $774.00 | 7 days | 9 Oct | 42.2% | On the quote |
| Shop ON-012Windsor, ON | $823.00 | 8 days | 10 Oct | 44.9% | Not selected |
Freight
Every leg from the carrier-neutral rating layer, Canada-only on. The line adds a 10% handling markup.
Margins and overrides
The margins this quote went out with.
Override history
Every change to the model on this job: the variable, the model’s value and the new one, the reason code and who made it.
No overrides on this job. It’s priced as the model has it.