JOB-26-0411
In productionOn trackPump manifold, rev B, for Buyer BUY-003, at Shop QC-018.
More
- Buyer
- Buyer BUY-003
- Longueuil, QC
- Quote
- CF-Q-26-0928
- Accepted 21 Oct 2026
- Order
- CF-26-10376
- Machining
- Ships by
- 10 Nov 2026
- Delivery by 12 Nov 2026
- Owner
- Chloé (demo)
- Estimator
Cost sheet
Study defaults, not approved yet- Quote, before tax
- $2,552.98
- What the buyer sees
- Our cost
- $1,912.91
- Supplier, shop and carriers
- Gross margin
- 25.1%
- $640.07
- Bids against check price
- 68.4%
- 100% means the bid matches the rules
Metal: Pump manifold
6061-T6, 30 pieces, Milled. Priced from the dated table, cheapest supplier first.
Stock from the geometry
- Part envelope
- 90 × 60 × 40 mm
- Milled
- Allowance
- 1.5 mm a side
- Needed
- 93 × 63 × 43 mm
- Stock size
- Bar, 2.500 × 2.000 × 3.750 in
- 63.5 × 50.8 × 95.25 mm
- Blanks
- 30, no spares
- Weight
- 24.9 kg
- 0.8 kg a blank
Lengths round up to the saw increment, 0.125 in, on the supplier’s size list.
Price from the table
Canadian metal supplier, QC. Price list valid 1 Oct 2026 to 31 Dec 2026.
| Supplier | Price | Cost | Line |
|---|---|---|---|
| Canadian metal supplier, QCCheapest, on the quote | $14.20 a kg | $443.41 | $532.09 |
| Canadian metal supplier, ON | $6.65 a lb ($14.66 a kg) | $479.87 | $575.84 |
| Canadian metal supplier, NS | $16.90 a kg | $510.60 | $612.72 |
| Canadian metal supplier, ON | $17.20 a kg | $515.07 | $618.08 |
Machining
Machining-only bids from shops, with the metal supplied cut to size. The line adds a 28% gross margin.
- Bid, machining only
- $1,400.00
- Rules check price
- $2,047.90
- Bid against check
- 68.4%
- Machining line
- $1,944.44
Line = bid ÷ (1 − 28%) × lead factor 1.00.
MR-26-0421Operations 10 to 40, 30 pieces
| Shop | Price | Days | Ships | Against check | Status |
|---|---|---|---|---|---|
| Shop QC-018Lévis, QC | $1,400.00 | 9 days | 31 Oct | 68.4% | On the quote |
| Shop NS-014Dartmouth, NS | $1,465.00 | 8 days | 30 Oct | 71.5% | Not selected |
| Shop QC-011Saint-Laurent, QC | $1,505.00 | 10 days | 1 Nov | 73.5% | Not selected |
Freight
Every leg from the carrier-neutral rating layer, Canada-only on. The line adds a 10% handling markup.
Margins and overrides
The margins this quote went out with.
Override history
Every change to the model on this job: the variable, the model’s value and the new one, the reason code and who made it.
No overrides on this job. It’s priced as the model has it.