JOB-26-0420

CostingAt risk

Encoder hub, rev A, for Demo buyer company.

Buyer
Demo buyer company
Kanata, ON
Quote
CF-Q-26-0940
In review at the desk
Order
Not yet
When the buyer accepts
Quote by
5 Nov 2026, 15:00
Owner
Chloé (demo)
Estimator

Next

Two bids in, Shop QC-011 lowest. Confirm how it holds Ø12 +0.005/0, then send the quote.

Review and send the quote

Parts and configuration

1 part, 30 pieces in all, as the buyer configured them.

  • Encoder hub

    Drawing DB-1130, rev A, part PT-0940-H

    30 piecesDesk review
    Material
    Aluminum 6061-T6
    Process
    Turned
    Finish
    As machined
    Tolerance
    Tight, ±0.025 mm or better
    Threads
    3 × M4 × 0.7
    Inspection
    CMM report
    Lead time
    Standard
    Envelope
    50 × 50 × 22 mm
    Machine
    Live-tooling lathe, 2 setups
    • encoder-hub-rev-a.step

      302 KB, STEP, rev A

    • DB-1130-A.pdf

      188 KB, Drawing, rev A

Quote CF-Q-26-0940

From upload to the quote going out.

  1. Files uploaded(Done)

  2. Submitted for a quote(Done)

  3. Flagged for desk review(Done)

    Bore Ø12 +0.005/0 and 0.005 runout are tighter than the rules price.
  4. Machining request MR-26-0433 sent(Done)

    2 of 3 shops have bid
  5. Price check BR-26-0855 sent to suppliers(Done)

    1 of 3 suppliers has replied
  6. Quote to the buyer(In progress)

  7. Buyer accepts(Not yet)

  8. Metal bought, machining placed(Not yet)

Notes

For the desk only. Buyers, shops and suppliers never see these.

  1. Chloé (demo)5 Nov 2026, 08:45Override: Tolerance factor

    Air-gauging every bore adds time the class factor misses.

  2. Pricing rules4 Nov 2026, 10:20Rules flag

    Bore Ø12 +0.005/0 and 0.005 runout are tighter than the rules price.

  3. Chloé (demo)4 Nov 2026, 10:20Desk note

    Two shops have bid; confirming how the bore is held before the quote goes out.

What the next person on this job should know.

Next actions

3 open of 5, from the job’s own records.

Next actions
Due 5 Nov 2026, 15:00TodayOpen
Due 5 Nov 2026, 15:00TodayOpen
Open
2 done

Money

Quoted, before tax
$1,399.95
Our cost
$1,026.53
Gross margin
$373.42 (26.7%)
Total with tax
When freight is rated
Open the cost sheet

People

  • Chloé (demo)

    Owner, quote desk

  • Jordan (demo)

    Quote desk

  • Alex (demo)

    Quote desk

  • Priya (demo)

    Buyer, Demo buyer company

  • Dana (demo)

    Shop contact, Shop NS-014

  • Karim (demo)

    Shop contact, Shop QC-011

  • Annie (demo)

    Supplier contact, Supplier QC-07 (cut-to-size)

Latest activity

  1. Override: Tolerance factor, 1.6 to 1.8

    Chloé (demo), 5 Nov 2026, 08:45

  2. Downloaded the drawing for MR-26-0433

    Karim (demo), 5 Nov 2026, 08:30

  3. Confirmed the reply from Supplier QC-07 (cut-to-size) on BR-26-0855

    Jordan (demo), 5 Nov 2026, 08:10

  4. Downloaded the drawing for MR-26-0433

    Dana (demo), 4 Nov 2026, 14:05

See 9 events